Please note : This help page is not for the latest version of Enterprise Architect. The latest help can be found here.
Project Upgrade
The structure of Enterprise Architect project files is occasionally changed to support more features. In such cases, the project might have to be upgraded.
Topic |
Detail |
See also |
||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Upgrading |
Upgrading to the new file structure is a simple and quick process that brings your project to the current level to:
|
|
||||||||||
Initial Check |
When you load a project that was created in an early release of Enterprise Architect (for example, an archived project) using a recent release of Enterprise Architect, the system determines whether the project should be upgraded and, if the upgrade is necessary, displays the Upgrade Wizard.
|
|
||||||||||
The Upgrade Project Wizard |
The Upgrade Project Wizard takes you through the upgrade process and:
|
|
Notes
• | If you are using replication in your models, and the upgrade wizard detects that the project you are opening is a replica and not a Design Master, a different upgrade path is required |
• | Once upgraded, the project cannot be opened with the version of Enterprise Architect in which it was created |
Learn more
The material ("material" includes all pages, documents and on-line graphics) on this web site is protected by copyright law. (C) 1998-2011 Sparx Systems Pty Ltd.