Sparx Systems Forum
Enterprise Architect => General Board => Topic started by: zlotin on January 10, 2002, 12:11:08 am
-
How can I display the callback call on sequational diagram?
When I draw the return message, it caused to the both classes to be displayed wrong.
-
HI,
By default, messages drawn from right to left are marked as 'Return' (dotted line, end of focus of control). You can open the message dialog and clear the 'Is Return' check box to inidicate that the message is not a return, but a callback to the other object.
Geoff Sparks