Sparx Systems Forum
Enterprise Architect => General Board => Topic started by: Erik R on January 13, 2014, 07:03:19 am
-
Hi,
I would like some help using the TOGAF gap/gap matrix feature.
This is mainly from a Archimate perspective and I will use this in my role as an enterprise architect.
First I like to understand what I do gap between. It would be swell if I could use baselines inside EA, a as is baseline and a target architecture baseline.
Second I would like to identify and work with the gap between two selected baselines.
My assumption is that I work in the very same EAP-file but this may be wrong.
Thanx,
Erik