Sparx Systems Forum
Enterprise Architect => General Board => Topic started by: thed0ctor on November 13, 2014, 04:39:13 pm
-
Hello, I have a sequence diagram and was wondering if it was possible to move the namespace below the actor?
-
The lifelines all reside inside the same Interaction as the SD itself. It would probably not make much sense to show their namespace.
q.