Sparx Systems Forum
Enterprise Architect => Suggestions and Requests => Topic started by: Guillaume on May 05, 2020, 11:17:02 pm
-
Hi,
When creating BPMN diagrams, it is common to add a node between 2 existing nodes e.g. to add a step/task between a task and a gateway (or other task).
Although it's not too difficult, I have to move the existing connector end (sequence flow) to the new task whilst creating a new connector from the new task to the next node.
I wonder if an option could let EA do this automatically i.e. if the element is created or moved above the connector between 2 nodes, connectors are automatically updated so it sits between the two.