Sparx Systems Forum

Enterprise Architect => Automation Interface, Add-Ins and Tools => Topic started by: Paolo F Cantoni on January 07, 2021, 11:10:06 pm

Title: Controlled package Save/Load versus Export/Import of Package
Post by: Paolo F Cantoni on January 07, 2021, 11:10:06 pm
We use Controlled Packages for inter-repository transport.  We don't use them for source control.

In this mode, I used to think that the only difference between using a controlled package in this way and export/import of a package using the manual (uncontrolled) method was that the XML file was defined.

However, in later versions, there seems to be a much more rigorous process using Controlled Packages.  Can anyone confirm?

TIA,
Paolo