I don't understand how to use the Loop Node (Structured Activity) in EA. Can someone please give an example how it is recommended to create a loop in an activity diagram in EA?
I know how to create a loop node. EA will display a structured activity that is linked to another activity diagram. But how do I model the setup, test and body sections?
-
I was confused by the same subject but I found an almost satisfying answer in the following thread. The answer is: loop nodes as defined by the OMG are not supported by EA.
http://www.sparxsystems.com/cgi-bin/yabb/YaBB.cgi?num=1245255522
Greetings from Nuremberg,
J.A. ;)