Bugs and Issues / Re: Import a diagram (.xml)
« on: December 07, 2023, 10:42:52 pm »
Yes, I`m referring to image data (.png).

2
Bugs and Issues / Re: Import a diagram (.xml)
« on: December 07, 2023, 07:56:47 pm »
Yes, correct. I`m importing package but the images remain blank w/o content.
Any idea to import also the content of the images while importing a package?


3
Bugs and Issues / Import a diagram (.xml)
« on: December 07, 2023, 02:43:42 am »
Hello network,

I have a problem while importing a .xml from a project to another one.
Even if the SysML is correctly imported, the images are not copied leaving a white rectangle w/o any content inside.
It seems that only the dimension of the picture has been imported but not the content.
Any idea?

4
Bugs and Issues / Re: [EA 15.2] - Search box in HTML export
« on: May 13, 2021, 06:37:14 pm »
Hi forum,

any news or idea on the topic? I have the same issue and an answer can be very helpful for me.

Best Regards,
P.

5
Bugs and Issues / Re: Font modification on sequence diagram
« on: May 06, 2021, 05:43:41 pm »
Could any other provide me a suggestion?
Did any other user have the same issue?

Best Regards,

P.

6
Bugs and Issues / Font modification on sequence diagram
« on: May 05, 2021, 09:30:30 pm »
Hello forum,

I need to change the font for message that is set to 8 and I need to set it to 12.
Basically I do not have the possibility to modify the font to all project since the flow chart already developed will be misaligned.

Do you have any idea how to proceed?

1. Is it possible to modify only the font to a message in a sequence diagram?
2. Is it possible to modify the font to all project without misaligning the contents already designed or realigning them automatically?

Best Regards,
P.

7
Bugs and Issues / Re: Copy Full Structure for duplication Issue
« on: October 08, 2020, 02:18:51 am »
Sorry, but I'm not sure to have fully understood your previous post. Did you experienced the opposite issue, that is the hyperlink to S2 pointing to S1 after the modification?

Do you have a workaround solution to manage such issues?

P.S. the version I used is 15.0.1514.

Best Regards

8
Bugs and Issues / Re: Copy Full Structure for duplication Issue
« on: October 08, 2020, 01:55:30 am »
Where's Activity diagram A?
Is there only one copy, or did you duplicate it as well (along with the sequence diagram)

I just tried it myself, but the hyperlink I created does not change when I duplicate the package with the sequence diagram.

Geert

The original scenario was the following:

`-- Main Project
    |-- Package P1
    |   `-- Activity Diagram A (that contains an hyperlink to S1)
    |   `-- Package P1.1
    |        `-- Sequence diagram S1
    |-- Package P2 (that is the copy of Package P1)
    |   `-- Activity Diagram B (that is the copy of Activity Diagram A)
    |   `-- Package P2.1 (that is the copy of Package P1.1)
    |        `-- Sequence diagram S2 (that is the copy of Sequence diagram S1)

I modified S2 and the structure is now the following:

`-- Main Project
    |-- Package P1
    |   `-- Activity Diagram A (now contains the wrong hyperlink to S2)
    |   `-- Package P1.1
    |        `-- Sequence diagram S1 (not modified)
    |-- Package P2 (that is the copy of Package P1)
    |   `-- Activity Diagram B (that is the copy of Activity Diagram A)
    |   `-- Package P2.1 (that is the copy of Package P1.1)
    |        `-- Sequence diagram S2 (modified by me)

In your trial, did you modify the sequence diagram after copying it?

9
Bugs and Issues / Re: Copy Full Structure for duplication Issue
« on: October 08, 2020, 01:26:24 am »
Instantiating elements is OK.
(you get a lifeline that has the element as classifier)

Adding elements as link is not (there is no lifeline object, just the linked element)

Geert

Hi Guys,

I`m following this discussion because I had the same issue on my project.

I tried to follow the indication from Geert:
Step 1. I draw a sequence diagram "S1" instantiating the elements (drag and drop the elements from block diagram to sequence diagram, selecting "drop as istance"). The sequence diagram "S1" is linked as hyperlink in the activity diagram "A".

Step 2. I "copy full structure for duplication" all the package that includes the sequence diagram "S1" and paste it in another package in the same project generating the Sequence diagram "S2" that is the "S1" duplication.

Step3. I modified only the sequence diagram "S2".

Step4. If I open the hyperlink to sequence diagram "S1" in the activity diagram "A", now it points to the "S2".

Can you please indicate me a procedure to maintain the original hyperlink to sequence diagram "S1" after copying it?
Have you noticed some wrong steps in my procedure?

Thank you in advance for your support.