Please note : This help page is not for the latest version of Enterprise Architect. The latest help can be found here.
Realize an Information Flow
After you create an information Flow connector you might want to:
- Realize one or more existing flows on the Information Flow connector
- Edit an existing flow on the Information Flow connector
You might also want to create and realize information flows on a non Information Flow connector, such as a Message on a Sequence diagram. You can perform these actions using the 'Information Flows Realized' dialog, which displays all existing flows that can be realized on the selected connector.
Access Right-click on connector | Advanced | Information Flows Realized
Review item flows on an Information Flow Connector
Operation |
Action |
---|---|
Realize Information Flows on the selected connector |
Select the checkbox for each required flow and click on the . |
Cancel realization of a flow |
Deselect the checkbox against the appropriate flow, and click on the . |
Change the classifier or Information Item elements conveyed on an Information Flow |
Click on the appropriate Information Item row, and on the button at the right-hand end of it. The 'Select Classifier' dialog displays:
Click on the to return to the 'Information Flows Realized' dialog and, if required, realize the changed flow as above. |
Create a realized information flow directly on a new connector |
|
Notes
- If there are several Information flows and you do not realize all of them, those that are not realized are represented by a separate Information Items Conveyed iteration of the Information Flow connector; you can only realize those flows on the original connector, at which point the flow is represented on that original connector
- If you realize all of the flows, they are combined on the one connector line
- If you realize an information flow on a connector, you can use the 'Find Items Conveyed' context menu option to locate the corresponding Information Flow item in the Project Browser
Learn more