Please note : This help page is not for the latest version of Enterprise Architect. The latest help can be found here.
Create Baselines
Access Project Browser | Right-click Package | Package Control | Package Baselines: New Baseline
Create a new baseline
Field |
Action |
See also |
---|---|---|
Name |
Display the Package name of the currently selected model branch.
|
|
Version |
Type a unique version reference for this Baseline, which can consist of any alphanumeric characters. The Package Baselines dialog sorts the Baselines according to the value of this field.
|
|
Include Sub-packages |
Include the entire sub-Package hierarchy of this branch in the Baseline; this option defaults to selected. If you deselect the checkbox, only the immediate contents (XMI stubs) of the Package are included in the Baseline.
|
|
Note |
Edit the default current time and date to any other value. The field is a single-line entry, for display on the Package Baselines dialog (a one-line-per-entry list).
|
|
OK |
Click to create a new Baseline and return to the Package Baselines dialog.
|
|
Notes
· | Package Baseline facilities are available in the Corporate, Business and Software Engineering, Systems Engineering and Ultimate editions of Enterprise Architect |