Please note : This help page is not for the latest version of Enterprise Architect. The latest help can be found here.

Create Review Document

When you are managing the work of a project team, it is useful to have a mechanism for coordinating and guiding the work that the team members are required to do on the elements in the Specification Package, such as a review document. You can generate this type of document quickly and simply within the Specification Manager, to be distributed, accessed and read through the Team Review facility.

There are, broadly, two types of review document that you can generate:

·A specification document that contains the material to be reviewed - the individual features of each element - such as a Model Overview, List of Issues or Maintenance Report, and
·A management or review document that guides the reader in applying tests, checks and procedures across the Package, such a Phase Review, Test Plan or Training Plan
 

You can generate both kinds of document from one of a range of templates, or create a document without using any template. The templates are all those available through the Report Generator (specification documents) or Linked Document Editor (management documents), whether system-provided or user-designed.

The specification documents automatically structure information from the Specification Manager according to the selected template and should not require further editing to serve their purpose (although it is possible to edit them if you wish). They are therefore termed 'auto-generated documents'.

By default, Review Documents are stored in folders (Topics) in a special category of the Team Review, called Formal Reviews. You can, however, generate those documents elsewhere in the Team Review, by binding the Specification Package to whichever Team Review folder is most appropriate to the Package. For example, if you have a modular structure in the Team Review, you might want to hold the Review Documents for a Specification Package in the same section of the Team Review as folders containing discussions and documents on the part of the model containing that Package.

Access      Tools | Specification Manager: SpecmanReview | Create Review Document
Tools | Specification Manager: SpecmanReview | Auto Generate Document
Tools | Specification Manager: SpecmanReview | Bind Package to Team Review Folder
 

Create a Review Document

Field/Option/Button

Action

See also

Name

On the Review Document dialog, type a name for the document.

This is the name that you use to recognize and open the document in the Team Review folders.

 

View Review Document

RTF Template

Click on the drop-down arrow and select either:

·None to create a free-format document yourself, or
·A document template name, to create a document of that type
 

 

OK

Click on this button to open the document in the Document Editor, which you can use to populate the document with text and images, format it and print it.

At the same time:

·The Team Review window opens
·The Formal Reviews category is created (if it does not already exist) in the Team Review
·A folder is created with the same name as the Specification Package (if it does not already exist) in the Formal Reviews category
·The review document name is added to this folder
 

If you have bound the Package to a different Team Review folder (see below), the Review Document is created in that folder instead of under the Formal Reviews category.

 

Custom Template Design Options  (for editing facilities)

 

 

Team Review Tools

Auto-generate a Review Document

Field/Option/Button

Action

See also

Name

On the Review Document dialog, type a name for the document.

This is the name that you use to recognize and open the document in the Team Review folders.

 

 

View Review Document

RTF Template

Click on the drop-down arrow and select a document report system-template name, to create a document of that type
 

 

OK

Click on this button to generate the document through the Document Report Generator, containing the information currently displayed in the Specification Manager, within the parameters of the report template.

At the same time:

·The Team Review window opens
·The Formal Reviews category is created (if it does not already exist) in the Team Review
·A folder is created with the same name as the Specification Package (if it does not already exist) in the Formal Reviews category
·The review document name is added to this folder
 

The document is displayed in the Team Review tab for any further editing and modification you need, although the document is effectively ready for immediate use.

If you have bound the Package to a different Team Review folder (see below), the Review Document is created in that folder instead of under the Formal Reviews category.

 

 

 

Team Review Tools

 

 

 

 

 

 

Custom Template Design Options  (for editing facilities)

 

Bind Package to different Team Review folder

Step

Action

See also

1

On the Select a Topic to Link dialog, click on the expansion box next to the appropriate category name to display the topic folders it contains.

 

 

2

Click on the appropriate topic folder name.

 

 

3

Click on the OK button.

When you:

·Create a Review Document, it will now be automatically stored in the selected topic folder
·Select the Show Current Review Folder option, the Team Review window will open with the selected folder name highlighted and expanded
·Select the Current Reviews option, the submenu will list the documents held in the selected folder
 

 

 

 

View Review Document

Notes

·For a given Specification Package, you can generate as many review documents as you require
·Before you generate a Review Document from the Specification Manager, you could run the system Spell Checker over the Specification Package to remove any errors in the text

Learn more

·Reporting (Spell Checker option)
?>