Please note : This help page is not for the latest version of Enterprise Architect. The latest help can be found here.
Gateway
A BPMN 1.1 Gateway control the way in which Sequence Flows converge and diverge within a Process. They provide a gating mechanism that either allows or blocks a Sequence Flow.
BPEL Properties:
- Double-click on the Gateway in the BPEL diagram
- Right-click on the Gateway in the BPEL diagram ( or the Project Browser ) and select the following context menu : BPEL | BPEL Properties
Reference:
Field/Button |
Usage |
See Also |
||||||
Name |
Specify the name for the Gateway |
|
||||||
Gateway |
Select the type for the Gateway, namely:
|
|
||||||
Details |
Depending on the selected Gateway, the Details tab changes as follows :
|
|
||||||
OK |
Save the values entered in the dialog |
|
||||||
Cancel |
Discard the values entered in the dialog |
|
||||||
Help |
Display this Help topic |
|
||||||
General |
Open the UML Properties dialog |
|||||||
Notes:
- The target of the outgoing Sequence Flows of this Event Exclusive Gateway must be either a:
- Receive Task
- Message or Timer Intermediate Event
- If a Message Task is one of the targets of the outgoing Sequence Flow of an Event Exclusive Gateway, then a Message Intermediate Event cannot be be the target of the other outgoing Sequence Flows of this Event Exclusive Gateway
The material ("material" includes all pages, documents and on-line graphics) on this web site is protected by copyright law. (C) 1998-2011 Sparx Systems Pty Ltd.