Book a Demo

Author Topic: BPMN: Sequence Flow cannot cross a pool boundary  (Read 25308 times)

MMA

  • EA User
  • **
  • Posts: 63
  • Karma: +3/-0
    • View Profile
Re: BPMN: Sequence Flow cannot cross a pool bounda
« Reply #15 on: January 15, 2015, 09:10:14 am »
Another option since EA12 RC2 is the BPMN Diagram Validator.

You an optionally turn off the message during modeling (Tools | Options | Links | Strict Connector Syntax | Uncheck) and validate the diagram (Context menu on BPMN Diagram | Validate Diagram) when you wanted.

The result will be showing in the System Output window, BPMN2.0 Tab. Double click on the message will highlight the elements on the diagram.

Give a try on that. ;)