Book a Demo

Author Topic: Check in bug in 9.2 when cancelling the comments  (Read 2457 times)

Guillaume

  • EA Practitioner
  • ***
  • Posts: 1405
  • Karma: +42/-2
    • View Profile
    • www.umlchannel.com
Check in bug in 9.2 when cancelling the comments
« on: February 22, 2012, 09:18:28 pm »
Hi,
I've experienced a bug with EA 9.2.921 which doesn't exist in v7.5 when sharing an EA model through an SVn respository.

Procedure to follow :
- run a check out on a controlled package
- run a check in on this package and once EA prompt the comment dialog window (info to be written in the SVN logs), click on cancel

The lock on the XMI file remains in SVN but EA no longer lets your run any check in (even though the package doesn't have any key/lock shown in the package explorer).
you have to cancel the lock on the SVN repository to run a check in again.

I haven't got this issue with EA 7.5 so it appears to be a bug.
Guillaume

Blog: www.umlchannel.com | Free utilities addin: www.eautils.com


Guillaume

  • EA Practitioner
  • ***
  • Posts: 1405
  • Karma: +42/-2
    • View Profile
    • www.umlchannel.com
Re: Check in bug in 9.2 when cancelling the commen
« Reply #1 on: March 13, 2012, 03:07:14 am »
This has been sorted out in version 9.3  :)

Thanks Sparx !
Guillaume

Blog: www.umlchannel.com | Free utilities addin: www.eautils.com