1
General Board / Re-sync status w/ VC provider for *ALL* pckgs ?
« on: November 13, 2010, 02:46:46 am »
On occasion EA client applications loose a connection to the version control system. Packages show that they are check-in, when they are really checked-in to the user.
One way to fix this is by right clicking on a package and selecting "package control->re-sync status w/ VC provider" However, this only re-synchs one package at a time. What if you have 100 (of 1000 total) packages that need to be re-synched? re-synching 1 by 1 would be very cumbersome.
One way to fix this is by right clicking on a package and selecting "package control->re-sync status w/ VC provider" However, this only re-synchs one package at a time. What if you have 100 (of 1000 total) packages that need to be re-synched? re-synching 1 by 1 would be very cumbersome.
- Is there a way to re-synch ALL packages w/ the VC?
- Would this be the equivalent to running a "Get All Latest" ?
Odd but true. I would much prefer your 20 seconds