Book a Demo

Author Topic: Help Reporting Internal Requirements/Diagram Level  (Read 5459 times)

Perry McLeod

  • EA Novice
  • *
  • Posts: 3
  • Karma: +0/-0
    • View Profile
Help Reporting Internal Requirements/Diagram Level
« on: October 10, 2009, 05:35:23 am »
I am very knew to EA. I have created a page with several controls. I have the following enabled:

Control > Feature Visibility > Attribute Visibility > Show > IsSelected

If I run a report on that control using the basic template the "Responsibilities (internal requirements)" and "Connections" elements will print; however if I generate the same report using the same template - but this time at the diagram level these elements will NOT print out.

It is critical that I be able to print these out otherwise I have wasted documenting all the internal requirements for each of the controls that I have on my screen.

Can someone give me some guidance here?

Perry McLeod, PMP, CBAP
Perry McLeod, CBAP, PMP
Senior Professional Services Consultant
Davis + Henderson
276 King Street West, Suite 400, Toronto, ON, M5V 1J2
Office: +1 (416) 360-1777 (x3460)| Toll Free: +1 (866) 345-6449 | Mobile: +1 (905) 330-78

smendonc

  • EA User
  • **
  • Posts: 148
  • Karma: +5/-0
  • I love YaBB 1 Gold!
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #1 on: October 10, 2009, 10:12:41 am »
The following options might help:

From the diagram properties, check the Diagram tab and make sure the 'Document Each Contained Element in RTF' is checked.

In the RTF generation box make sure the 'Include all diagram elements in Report' option is checked.

In rereading the post I need to note that I tried this with classes not controls and it worked correctly in both cases.

Dermot

  • EA Administrator
  • EA User
  • *****
  • Posts: 591
  • Karma: +7/-0
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #2 on: October 16, 2009, 05:17:33 pm »
If you are using Builds post 834 - you simply need to set the template to include the Section - Diagram::Elements - leave this blank to replicate - Package::Element.
Then so long as: F8 | Include All Diagram Elements in Report -  is checked this will render the diagram Elements.

MBernoldi

  • EA Novice
  • *
  • Posts: 1
  • Karma: +0/-0
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #3 on: October 17, 2009, 05:51:31 am »
Hi, i have crated a profile and a 'composite element'.
whem i create that element a child driagram is created too. there is  a way to create that child diagram with the option 'Document each contained element in RTF" set true?!

Tks

Dermot

  • EA Administrator
  • EA User
  • *****
  • Posts: 591
  • Karma: +7/-0
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #4 on: October 19, 2009, 04:05:52 pm »
Do the same with the: Element::Diagram - section - tick it, but leave it blank to replicate: Package::Diagram.

Perry McLeod

  • EA Novice
  • *
  • Posts: 3
  • Karma: +0/-0
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #5 on: October 20, 2009, 01:12:50 am »
I am using build 7.5-847. I tried to follow the instructions which as me to deselect the "Diagram::Element" but I am not sure if a did it right.

I did not get the responsibilities to render.

I'd like to send a ZIP that contains the EA diagram, the modified template and an image of what I did in the template. How can I do this?

Thanks for all of your help everyone.

Perry McLeod
Perry McLeod, CBAP, PMP
Senior Professional Services Consultant
Davis + Henderson
276 King Street West, Suite 400, Toronto, ON, M5V 1J2
Office: +1 (416) 360-1777 (x3460)| Toll Free: +1 (866) 345-6449 | Mobile: +1 (905) 330-78

KP

  • EA Administrator
  • EA Expert
  • *****
  • Posts: 2919
  • Karma: +55/-3
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #6 on: October 20, 2009, 09:14:43 am »
Quote
I'd like to send a ZIP that contains the EA diagram, the modified template and an image of what I did in the template. How can I do this?
mailto:[email protected]
« Last Edit: October 20, 2009, 09:19:25 am by KP »
The Sparx Team
[email protected]

Perry McLeod

  • EA Novice
  • *
  • Posts: 3
  • Karma: +0/-0
    • View Profile
Re: Help Reporting Internal Requirements/Diagram L
« Reply #7 on: October 21, 2009, 12:01:09 am »
Done
Perry McLeod, CBAP, PMP
Senior Professional Services Consultant
Davis + Henderson
276 King Street West, Suite 400, Toronto, ON, M5V 1J2
Office: +1 (416) 360-1777 (x3460)| Toll Free: +1 (866) 345-6449 | Mobile: +1 (905) 330-78