I distinctly remember being able to link to activities using a control flow, yet currently, I get a message that this is not UML complant. So, create an activity diagram, add a statr node and 2 activities and when I try to add any controlflow, it refuses. This is on EA 15.2. and 15.1, however, on 14.1 it works fine (although for a control flow between two activities I have to drag from the toolbox, rather than using the diagram control). When I load the 14.1 diagram in 15.2, it shows the flow, I can edit it, but it still refuses to add new flows to those elements. What am I missing, or is this not as it should be?